<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1491912051620464&amp;ev=PageView&amp;noscript=1">

Reduce Lead Times, Cut Costs & Scale Efficiently

Struggling with long lead times, high engineering effort, or growing product complexity? Many organizations rely on Engineer to Order (ETO), but as customer expectations evolve, ETO can quietly limit scalability and profitability.

This guide includes:

  • A self‑assessment to determine whether ETO is holding your company back
  • A maturity roadmap outlining the key stages in moving from ETO to CTO
  • A real‑world case study showing how modular product architecture enables a smooth transition

By shifting to a Configure to Order model, companies can reduce lead times, lower engineering costs, and scale product variety — without adding complexity.

Ready to simplify your operations and improve performance? Start by downloading the guide now.

Download the Guide

Fill out the form below, and we will share the download link.

Trusted by Industry Leaders Worldwide

Wärtsilä 200x100
Metso 200x100
ABB 200x100
Mabe 200x100
Permobil 200x100
Uhlmann 200x100
Valmet  200x100
Alfa Laval 200x100
Oilon 200x100
Körber 200x100
Volvo Trucks 200x100